EV Charging Stations Solutions

Charging 101

Plug-in electric vehicles can be charged using standard outlets (110V), which are called Level 1 charging. They can also be charged at Level 2 stations (240V), or at DC Fast Charge stations (480V). Level 1 charging will charge a vehicle completely in 8 to 17 hours, depending on the size of the battery in the vehicle. At a Level 2 station most vehicles will be fully charged in 4-10 hours. High energy consuming appliances, such as clothes dryers, use outlets with this voltage. Finally, in order to make charging while away from home quick and convenient, even faster charging stations are being installed in some locations: Level 3 (or DC Fast Charge) stations. DC Fast Chargers can charge a fully depleted Nissan LEAF to 80 percent capacity in 15 to 30 minutes.

EV Charging Stations Partners

All of the vendors listed below currently have been awarded cooperative contracts via Sourcewell, available to any Sourcewell member nationwide.

EV Charging Stations Contracts

To view our EV Charging Stations contracts, visit our Contract Documents page.